Jazan Integrated Gasification Combined Cycle Project
Utilities & Common Area Pkg # 5- February 19, 2017
- case Study
- Posted by aesarabia helpdesk
- Comments Off on Jazan Integrated Gasification Combined Cycle Project
Project Completion Date: 2017
Project Briefing:
Design, Engineering, Manufacture/Fabrication, Inspection/Testing, Painting/Packing, Supply, Supervision of Installation, Supervision of Commissioning and Training of Seawater Desalination System.
Client Requirements:
Main Sea Water RO System Flow Rate: 4 x 13,000 m3/day&2×7,344m3/day
Waste Water RO System (Feed Is Tertiary
Treated Waste Water): 2 x6,600m3/day
AES Projected Solution:
SR. NO. SYSTEM DESCRIPTION FEED WATER GUARANTEES TREATMENT 1 Potable Water SWRO System Actual – Sea water with TDS of42000 ppm
Design TDS – 46400 ppm TDS – 100 to 500 ppm
Calcium – > 30 ppm as CaCO3
Alkalinity – > 40 ppm as CaCO3 Filter – UF – SWRO – Lime contact filter 2 Main Sea Water RO System –
1st Pass Actual – Sea water with TDS of
42000 ppm
Design TDS – 46400 ppm No guarantees for the feed water
to second pass Filter – UF – SWRO Main Sea Water RO System –
Utility Water [...]
North Ghawar Oil Field – Aindar Well
Project Completion Date: December 2016- February 19, 2017
- case Study
- Posted by
- Comments Off on North Ghawar Oil Field – Aindar Well
Project Briefing:
Saudi Aramco want to have Oil Modular Skids in order to reduce field installation time and complexity by moving a majority of the required components onto a pre-fabricated standard design that can be re-used at any of the single well locations after depletion of associated Oil well.
Client Requirements:
Aramco requested Oil Modular Skids to be installed in a remote area near Wellhead in order to perform the following tasks:-
a) To regulate the pressurized stream of Oil. b) To measure flowrates of multiphase fluid. c) To inject chemicals. d) To launch Pig in the main pipeline. e) To get Samples of Oil. f) To control and analyze all process parameters.AES Solution:
AES Provided Aramco with Modular Skid to be installed near wellhead includes different equipment and instruments installed on the skid as per the followings:
a) Choke Valve: To regulate the pressurized stream of Oil. b) Multiphase Flow Meter (MPFM): To [...]Khuff Gas Project
Project Completion Date: December - 2012- February 19, 2017
- case Study
- Posted by
- Comments Off on Khuff Gas Project
Project Briefing:
Saudi Aramco wants to prevent hydrate formation primarily during startup of wellhead.
Client Requirements:
Client requested chemical injection skids per each wellhead to avoid hydrate formation.
AES Solution:
AES provided Methanol Injection Skids to be used to inject Methanol into Wellhead Piping Stream of Choke Valves in order to prevent hydrate formation primarily during startup.
Conclusion and Results:
AES designed, fabricated, tested and supplied 40 nos. Methanol Injection Skids with 517 barg (7500 psig)discharge pressure by using special tubing of SS in the discharge line of the API Dosing Pumps
King Khalid International Airport
Project Completion Date: October - 1998- February 19, 2017
- case Study
- Posted by
- Comments Off on King Khalid International Airport
Project Briefing:
MODA wanted to upgrade the aging RO plant in King Khalid International Airport. The plant was facing lot of problems due to huge influx of iron from deep wells.
Client Requirements:
Client wanted to Refurbish five skids with combined capacity of 14,000 m3/day:
TDS: < 1,500 ppm
pH: 7.2
Ca: 300 ppm
Mg: 80 ppm
Na: 550 ppm
SO4: 420 ppm
Cl: 400 ppm
HCO3: 120 ppm
Iron: < 20 ppm
So it can be supply process water to the facilities in the area:
pH: 8.5
TDS: < 120 ppm
Silica < 1 ppm
AES Solution:
AES went ahead and replaced existing hollow fiber membranes with the new technology of spiral wound membranes. The challenge was to convince the client with the new technology, since it was new in the market.
AES also improved removal of iron in the pretreatment by introducing aeration by natural means, through cascade aeration.
AES also improved on [...]
Al Safi Dairy Company
Project Completion Date: Ongoing- February 19, 2017
- case Study
- Posted by
- Comments Off on Al Safi Dairy Company
Project Briefing:
Al Safi wanted urgently to treat their wastewater to meet discharge requirements and use for restricted irrigation.
The wastewater is characterized by high COD/ BOD values, and large amount of suspended solids.
Client Requirements:
Al-Safi wanted to treat wastewater from their dairy farm:
Flow rate: 6,000 m3/day
TDS: < 1,500 ppm
pH: 7.6
COD: 2,700 ppm
TSS: 1,700 ppm
BOD: 1,400 ppm
Total Nitrogen: 111 ppm
Phosphate: 20 ppm
So it can be reused in the plant with requirements to be:
pH: 8.5
COD: < 30 ppm
TSS: < 10 ppm
BOD: < 10 ppm
AES Solution:
In order to properly handle the wastewater, two stages of aeration are used to drop the COD/ BOD, so it can reach low levels. Each Aeration tank has it is own clarifier and sludge recycling system.
The plant is equipped with equalization tank, sludge digesting facility, and manual and automatic inlet screens.
Conclusion and Results:
Despite [...]
Petrokemya ABS Project
Project Completion Date: March- 2015- February 19, 2017
- case Study
- Posted by
- Comments Off on Petrokemya ABS Project
Project Briefing:
AES Arabia was awarded a contract by the Spanish EPC contractor TecnicasReunidas to supply a wastewater treatment plant for Petrokemya Acrylonitrile Butadiene Styrene polymer (ABS) Project located in Al-Jubail Industrial City, Kingdom of Saudi Arabia. The petrochemical plant is the largest ABS emulsion producing plant in the world with 140,000 Metric tons per year. The raw materials used in the plant are Styrene (SM), Ethyl Benzene (EB), Butadiene (BD), Acrylonitrile (ACN), and Methyl Methacrylate (MMA). The ABS emulsion product shall be of Molding/ Extrusion/ Pipe commercial grades.
The plant will treat several wastewater streams collected from all over the plant, for a total combined flow of 2,400 m3/day.
Client Requirements:
PETROKEMYA wanted to treat wastewater for the ABS process:
Flow rate: 100 m3/hr
TDS: 2,500 ppm
pH: 1 – 2
COD: 2,000 ppm
TSS: 1,000 ppm
So it can be reused in the plant with requirements to be:
Flow rate: 100 m3/hr
TDS: < 110 ppm
pH: 8.5
COD: < 30 ppm
[...]Jeddah South Power Project (JSPP)
Project Completion Date: July- 2015- February 19, 2017
- case Study
- Posted by
- Comments Off on Jeddah South Power Project (JSPP)
Project Briefing:
Saudi Electric company wanted to install a seawater desalination plant for its South Jeddah Power Plant. The plant will feed the thermal steam generators. So the quality of the water is important.
Client Requirements:
The plant needs to take seawater from a beach well and desalinate the raw seawater to produce water of the following quantity:
Flow rate: 2 x 3,600 m3/day
TDS: < 42,000 ppm
pH: 8.5
Hardness: < 500 ppm as Ca
So it can be fed to the Thermal Steam Generators:
TDS < 50 ppm
pH: 6 – 8
Hardness: < 20 ppm as CaCO3
AES Solution:
AES provided pretreatment to the RO plant including the perchlorination, ferric chloride dosing for coagulation. Two stage of filtration is provided to ensure proper removal of suspended solid. Multimedia filters are followed by sand media filters.
To ensure proper quality of treated water, two passes of RO units are provided. 1st pass will [...]
Abdullah University Science & Technology
Project Completion Date: November - 2008- February 19, 2017
- case Study
- Posted by
- Comments Off on Abdullah University Science & Technology
Project Briefing:
King Abdullah University of Science and Technology wanted to construct a seawater RO plant to desalinate water for its various uses in the university. The Project Manager was Aramco, and the awarded company has to comply with various Aramco requirements and specifications.
Client Requirements:
The plant needs to take seawater from an open intake and desalinate,
Flow rate: 59,200 m3/day
TDS: < 50,000 ppm
pH: 8.5
Hardness: < 500 ppm as CaCO3
So it can be fed to various users within the university:
TDS < 110 ppm
pH: 6 – 8
Hardness: < 40 ppm as CaCO3
AES Solution:
AES Provided four (4) SWRO skids, and four (4) BWRO skids. Also AES provided Sand/ Multimedia Filters for the project
Conclusion and Results:
The plant was operated as designed. Treated water met the conditions set by the client.
Upgrade of Central RO System in Jubail
Project Completion Date: October - 2002- February 19, 2017
- case Study
- Posted by
- Comments Off on Upgrade of Central RO System in Jubail
Project Briefing:
The Royal Commission wanted to upgrade its 20 years aging RO systems in 3 different locations. They also wanted to install new media filters, degasser, and controls.
Client Requirements:
Refurbish three plants with combined capacity of 37,000 m3/day:
Plant No. 1 Flow rate: 2 x 210 m3/hr
Plant No. 2 Flow rate: 2 x 210 m3/hr
Plant No. 3 Flow rate: 3 x 210 m3/hr
TDS: < 3,500 ppm
pH: 7.2
Ca: 270 ppm
Mg: 118 ppm
Na: 751 ppm
SO4: 1,020 ppm
Cl: 1,124 ppm
HCO3: 193 ppm
So it can be supply process water to the facilities in the area:
pH: 8.5
TDS: 30 – 80 ppm
Conductivity: 60 – 150 MS/cm
AES Solution:
The existing system was know to have trouble in fouling and scaling, also the quality of the treated water was not consistent. AES improved the design of the RO system, by reducing the flux on the membranes [...]