Project Completion Date: 2017
Project Briefing:

Design, Engineering, Manufacture/Fabrication, Inspection/Testing, Painting/Packing, Supply, Supervision of Installation, Supervision of Commissioning and Training of Seawater Desalination System.

 Client Requirements:

Main Sea Water RO System Flow Rate:         4 x 13,000 m3/day&2×7,344m3/day

Waste Water RO System (Feed Is Tertiary

Treated Waste Water):                                       2 x6,600m3/day

 AES Projected Solution:

SR. NO. SYSTEM DESCRIPTION FEED WATER GUARANTEES TREATMENT 1 Potable Water SWRO System Actual – Sea water with TDS of

42000 ppm

Design TDS – 46400 ppm TDS – 100 to 500 ppm

Calcium – > 30 ppm as CaCO3

Alkalinity – > 40 ppm as CaCO3 Filter – UF – SWRO – Lime contact filter 2 Main Sea Water RO System –

1st Pass Actual – Sea water with TDS of

42000 ppm

Design TDS – 46400 ppm No guarantees for the feed water

to second pass Filter – UF – SWRO Main Sea Water RO System –

Utility Water [...]

North Ghawar Oil Field – Aindar Well

Project Completion Date: December 2016

Project Briefing:

Saudi Aramco want to have Oil Modular Skids in order to reduce field installation time and complexity by moving a majority of the required components onto a pre-fabricated standard design that can be re-used at any of the single well locations after depletion of associated Oil well.

 Client Requirements:

Aramco requested Oil Modular Skids to be installed in a remote area near Wellhead in order to perform the following tasks:-

a) To regulate the pressurized stream of Oil. b) To measure flowrates of multiphase fluid. c) To inject chemicals. d) To launch Pig in the main pipeline. e) To get Samples of Oil. f) To control and analyze all process parameters.

 AES Solution:

AES Provided Aramco with Modular Skid to be installed near wellhead includes different equipment and instruments installed on the skid as per the followings:

a) Choke Valve: To regulate the pressurized stream of Oil. b) Multiphase Flow Meter (MPFM): To [...]

Khuff Gas Project

Project Completion Date: December - 2012

Project Briefing:

Saudi Aramco wants to prevent hydrate formation primarily during startup of wellhead.

 Client Requirements:

Client requested chemical injection skids per each wellhead to avoid hydrate formation.

 AES Solution:

AES provided Methanol Injection Skids to be used to inject Methanol into Wellhead Piping Stream of Choke Valves in order to prevent  hydrate formation primarily during startup.

 Conclusion and Results:

AES designed, fabricated, tested and supplied 40 nos. Methanol Injection Skids with 517 barg (7500 psig)discharge pressure by using special tubing of SS in the discharge line of the API Dosing Pumps

King Khalid International Airport

Project Completion Date: October - 1998

Project Briefing:

MODA wanted to upgrade the aging RO plant in King Khalid International Airport. The plant was facing lot of problems due to huge influx of iron from deep wells.

 Client Requirements:

Client wanted to Refurbish five skids with combined capacity of 14,000 m3/day:

TDS: < 1,500 ppm

pH: 7.2

Ca: 300 ppm

Mg: 80 ppm

Na: 550 ppm

SO4: 420 ppm

Cl: 400 ppm

HCO3: 120 ppm

Iron: < 20 ppm

So it can be supply process water to the facilities in the area:

pH: 8.5

TDS: < 120 ppm

Silica < 1 ppm

 AES Solution:

AES went ahead and replaced existing hollow fiber membranes with the new technology of spiral wound membranes. The challenge was to convince the client with the new technology, since it was new in the market.

AES also improved removal of iron in the pretreatment by introducing aeration by natural means, through cascade aeration.

AES also improved on [...]

Al Safi Dairy Company

Project Completion Date: Ongoing

Project Briefing:

Al Safi wanted urgently to treat their wastewater to meet discharge requirements and use for restricted irrigation.

The wastewater is characterized by high COD/ BOD values, and large amount of suspended solids.

 Client Requirements:

Al-Safi wanted to treat wastewater from their dairy farm:

Flow rate: 6,000 m3/day

TDS: < 1,500 ppm

pH: 7.6

COD: 2,700 ppm

TSS: 1,700 ppm

BOD: 1,400 ppm

Total Nitrogen: 111 ppm

Phosphate: 20 ppm

So it can be reused in the plant with requirements to be:

pH: 8.5

COD: < 30 ppm

TSS: < 10 ppm

BOD: < 10 ppm

 AES Solution:

In order to properly handle the wastewater, two stages of aeration are used to drop the COD/ BOD, so it can reach low levels. Each Aeration tank has it is own clarifier and sludge recycling system.

The plant is equipped with equalization tank, sludge digesting facility, and manual and automatic inlet screens.

 Conclusion and Results:

Despite [...]

Petrokemya ABS Project

Project Completion Date: March- 2015

Project Briefing:

AES Arabia was awarded a contract by the Spanish EPC contractor TecnicasReunidas to supply a wastewater treatment plant for Petrokemya Acrylonitrile Butadiene Styrene polymer (ABS) Project located in Al-Jubail Industrial City, Kingdom of Saudi Arabia. The petrochemical plant is the largest ABS emulsion producing plant in the world with 140,000 Metric tons per year. The raw materials used in the plant are Styrene (SM), Ethyl Benzene (EB), Butadiene (BD), Acrylonitrile (ACN), and Methyl Methacrylate (MMA). The ABS emulsion product shall be of Molding/ Extrusion/ Pipe commercial grades.

The plant will treat several wastewater streams collected from all over the plant, for a total combined flow of 2,400 m3/day.

 Client Requirements:

PETROKEMYA wanted to treat wastewater for the ABS process:

Flow rate: 100 m3/hr

TDS: 2,500 ppm

pH: 1 – 2

COD: 2,000 ppm

TSS: 1,000 ppm

So it can be reused in the plant with requirements to be:

Flow rate: 100 m3/hr

TDS: < 110 ppm

pH: 8.5

COD: < 30 ppm

[...]

Jeddah South Power Project (JSPP)

Project Completion Date: July- 2015

Project Briefing:

Saudi Electric company wanted to install a seawater desalination plant for its South Jeddah Power Plant. The plant will feed the thermal steam generators. So the quality of the water is important.

 Client Requirements:

The plant needs to take seawater from a beach well and desalinate the raw seawater to produce water of the following quantity:

Flow rate: 2 x 3,600 m3/day

TDS: < 42,000 ppm

pH: 8.5

Hardness: < 500 ppm as Ca

So it can be fed to the Thermal Steam Generators:

TDS < 50 ppm

pH: 6 – 8

Hardness: < 20 ppm as CaCO3

 AES Solution:

AES provided pretreatment to the RO plant including the perchlorination, ferric chloride dosing for coagulation. Two stage of filtration is provided to ensure proper removal of suspended solid. Multimedia filters are followed by sand media filters.

To ensure proper quality of treated water, two passes of RO units are provided. 1st pass will [...]

Abdullah University Science & Technology

Project Completion Date: November - 2008

Project Briefing:

King Abdullah University of Science and Technology wanted to construct a seawater RO plant to desalinate water for its various uses in the university. The Project Manager was Aramco, and the awarded company has to comply with various Aramco requirements and specifications.

 Client Requirements:

The plant needs to take seawater from an open intake and desalinate,

Flow rate: 59,200 m3/day

TDS: < 50,000 ppm

pH: 8.5

Hardness: < 500 ppm as CaCO3

So it can be fed to various users within the university:

TDS < 110 ppm

pH: 6 – 8

Hardness: < 40 ppm as CaCO3

 AES Solution:

AES Provided four (4) SWRO skids, and four (4) BWRO skids. Also AES provided Sand/ Multimedia Filters for the project

 Conclusion and Results:

The plant was operated as designed. Treated water met the conditions set by the client.

Upgrade of Central RO System in Jubail

Project Completion Date: October - 2002

Project Briefing:

The Royal Commission wanted to upgrade its 20 years aging RO systems in 3 different locations. They also wanted to install new media filters, degasser, and controls.

Client Requirements:

Refurbish three plants with combined capacity of 37,000 m3/day:

Plant No. 1 Flow rate: 2 x 210 m3/hr

Plant No. 2 Flow rate: 2 x 210 m3/hr

Plant No. 3 Flow rate: 3 x 210 m3/hr

TDS: < 3,500 ppm

pH: 7.2

Ca: 270 ppm

Mg: 118 ppm

Na: 751 ppm

SO4: 1,020 ppm

Cl: 1,124 ppm

HCO3: 193 ppm

So it can be supply process water to the facilities in the area:

pH: 8.5

TDS: 30 – 80 ppm

Conductivity: 60 – 150 MS/cm

AES Solution:

The existing system was know to have trouble in fouling and scaling, also the quality of the treated water was not consistent. AES improved the design of the RO system, by reducing the flux on the membranes [...]