Site icon Sewage Treatment – Reverse Osmosis – Waste water Treatment

Chemical injection system references

Shaybah – Saudi Arabia

Client Name Gulf Elite General Contracting
Project Name Shaybah Industrial Support  Facilities Project
End User Saudi Aramco
Scope of Work Design, Supply
Type and Capacity of the Skid 1) Sodium Hypochlorite Inj. Sys. 0.5 LPH @ 10.34 Bar
Quantity 1
Completion Date Ongoing

Safaniya, Marjan & Zuluf – Saudi Arabia

Client Name Saudi Aramco
Project Name Offshore Platfoam Project
End User Saudi Aramco
Scope of Work Design, Supply
Type and Capacity of the Skid 1) Oxygen Scavenger Chem. Inj. Sys. 19.68 LPH @ 18.92 Bar
Quantity 1
Completion Date Ongoing

Wasit – Saudi Arabia

Client Name S.K. Engineering & Construction Co.
Project Name Wasit Inlet & Gas Processing Project  – Package # 1
End User Saudi Aramco
Scope of Work Design, Supply
Type and Capacity of the Skid
  1. TEG Antifoam Chemical Inj. Sys. 3.0 LPH @ 10.4 Bar (4)
  2. TEG Acetic Acid Chem. Inj. Sys. 6.26 LPH @ 4.2 Bar (4)
  3. TEG Amine Chem. Inj. Sys. 3.0 LPH @ 6.9 Bar (4)
  4. Methanol Chemical Inj. Sys. 4,545 LPH @ 76.9 Bar (1)
  5. AGR Antifoam Chem. Inj. Sys. 5.68 LPH @ 25.0 Bar (4) Quantity17Completion DateOngoing

 

Wasit – Saudi Arabia

Client Name S.K. Engineering & Construction Co.
Project Name Wasit SRU & Utilities Project – Package # 3
End User Saudi Aramco
Scope of Work Design, Supply
Type and Capacity of the Skid 1) Sultite Chemical Inj. Sys. 5.7 LPH @ 86.87 Bar (4)

2) Phosphate Chemical Inj. Sys. 5.7 LPH @ 86.87 Bar (4)Quantity8Completion DateOngoing

 

Shaybah – Saudi Arabia

Client Name Samsung Engineering Co.
Project Name Shaybah Package # 1 Inlet Facilities & Gas Treatment
End User Saudi Aramco
Scope of Work Design, Supply
Type and Capacity of the Skid 1) Antifoam Chemical Inj. Sys. 117 LPH @ 6.89 Bar
Quantity 2
Completion Date Ongoing

 

Shaybah – Saudi Arabia

Client Name Samsung Engineering
Project Name Shaybah NGL Recovery & Utilities Project (Package # 2)
End User Saudi Aramco
Scope of Work Design, Supply
Type and Capacity of the Skid 1) Coagulant Chemical Inj. Sys. 7.57 LPH @ 7.03 Bar

2) Caustic Chemical Inj. Sys. 81 LPH @ 2.75 Bar

3) Sodium Hypochlorite Chem. Inj. Sys. 8.55LPH @ 2.75 Bar

4) Antiscalant Chemical Inj. Sys. 37.77 LPH @ 3.44 Bar

5) Polymer Chemical Inj. Sys. 9.38 LPH @ 7.03 Bar

6) Calcium Bicarbonate Chem. Inj. Sys. 2.91 LPH @ 7.65 Bar

7) Sulfuric Acid Chemical Inj. Sys. 81.27 LPH @ 18.46 Bar

8) Biocide Chemical Inj. Sys. 0.91 LPH @ 2.75 Bar

9) Corrosion Inhibitor Chemical Inj. Sys. 3.78 LPH @ 2.75 Bar

10) Corrosion Inhibitor Chemical Inj. Sys. 18.92 LPH @ 2.75 Bar

11) Amine Chemical Inj. Sys. 1.81 LPH @ 16.18 Bar

12) Oxygen Scavenger Chemical Inj. Sys. 0.53 LPH @ 16.18 Bar

13) Antiscalant Chemical Inj. Sys. 1.81 LPH @ 16.18 BarQuantity13Completion DateOngoing

 Hawiya, Haradh, Shedgum & Uthmaniyah – Saudi Arabia

Client Name Saudi Aramco
Project Name Khuff Gas Project
End User Saudi Aramco
Scope of Work Design, Supply
Type and Capacity of the Skid 1) Methanol Chemical Inj. Sys. 227 LPH @ 517.3 Bar
Quantity 40
Completion Date Ongoing

 Manifa – Saudi Arabia 

Client Name Saudi Aramco
Project Name Manifa Well Sites
End User Saudi Aramco
Scope of Work Design, Supply
Type and Capacity of the Skid 1) Corrosion Inhibitor Chemical Inj. Sys. 0.79 LPH @ 139 Bar
Quantity 21
Completion Date Ongoing

 Manifa – Saudi Arabia 

Client Name Suedrohrbau Saudi Arabia Ltd.
Project Name Manifa Water Supply Down Stream Pipelines
End User Saudi Aramco
Scope of Work Design, Supply, Installation & Commissioning
Type and Capacity of the Skid 1) Corrosion Inhibitor Skid – 8.6 LPH @ 97.3 bar

 

2) Corrosion Inhibitor Skid – 7.1 LPH @ 48 barQuantity2Completion DateOngoing  Manifa – Saudi Arabia 

Client Name Petrojet Saudi Arabia
Project Name Manifa Upstream Onshore Pipeline Project
End User Saudi Aramco
Scope of Work Design, Supply
Type and Capacity of the Skid Demulsifier Injection System – 50 LPH @ 143 bar
Quantity 2
Completion Date Ongoing

 Jubail – Saudi Arabia 

Client Name Samsung Engineering
Project Name SAMCO Acrylic Acid Project
End User SAMCO (Joint Venture of Dow & Tasnee)
Scope of Work Design, Supply
Type and Capacity of the Skid 1) Cooling Water Chemical Inj. Sys. 120 LPH @ 3.0Bar

2) Seawater Chemical Injection System 120 LPH @ 3.3Bar

3) Amine Dosing Injection System 1.4 LPH @ 4.8 Bar

4) Oxygen Scavenger Inj. System 1.4 LPH @ 2.7 Bar

5) Phosphate Inj. System 1.8, 1.6 and 0.06 LPH @ 65.9BarQuantity5Completion DateOngoing  Wasea – Saudi Arabia 

Client Name Sinopec International Petroleum Services Corp.
Project Name Aramco Wasea Bulk Plant
End User Saudi Aramco
Scope of Work Design, Supply
Type and Capacity of the Skid 1) Detergent Chemical Inj. Sys. Head A -1664 LPH @ 6.9Bar

2) Detergent Chemical Inj. Sys. Head B -71 LPH @ 6.9BarQuantity2Completion DateMay 2012  Riyadh – Saudi Arabia 

 

Client Name Al Suwaidi Industrial Services Co.
Project Name Riyadh Refinery Platformer Heater Replacement Project
End User Saudi Aramco
Scope of Work Design, Supply
Type and Capacity of the Skid 1) Caustic/ Phosphate Inj. Sys. 20 LPH @ 49.2Bar

2) Sulphide Injection System 0.19 LPH @ 23.0BarQuantity2Completion DateMay 2012 Shedgum – Saudi Arabia 

 

Client Name Saudi Aramco
Project Name Shedgum Gas Plant
End User Saudi Aramco
Scope of Work Design, Supply
Type and Capacity of the Skid Sodium Hypochlorite Inj. Sys 3.0 LPH @ 10.0 Bar
Quantity 2
Completion Date May 2012

 Jubail – Saudi Arabia 

Client Name Samsung S.A Ltd
Project Name Jubail Export Refinery Package – 5
End User SATORP (Saudi Aramco Total Joint Venture)
Scope of Work Design, Supply
Type and Capacity of the Skid 1) Demulsifire Injection System 2.3 LPH @ 3.7Bar

2) Ammonium Polysulfide Inj. Sys 32.5 LPH @ 19.3 Bar

3) Phosphate Injection System 1.3 LPH @ 18.5 Bar

4) Anti-oxidant Injection System 30.0 LPH @ 9.6 Bar

5) Antifoam Injection System 57.0 LPH @ 6.8 BarQuantity5Completion DateMay 2012  Qatif – Saudi Arabia 

Client Name Saudi Aramco
Project Name Qatif Oil Field Project
End User Saudi Aramco
Scope of Work Design, Supply
Type and Capacity of the Skid 1) Corrosion Inhibitor Chemical Inj. Sys. 1.61 LPH @ 142 Bar
Quantity 2
Completion Date April 2012

 Jubail – Saudi Arabia 

Client Name M.R. Al Khathlan Est.
Project Name Jubail Export Refinery Package 5C
End User SATORP (Saudi Aramco Total Joint Venture)
Scope of Work Design, Supply
Type and Capacity of the Skid Chlorination Injection System – 30 LPH @ 8.0 bar
Quantity 1
Completion Date December 2011

 Jubail – Saudi Arabia 

Client Name Samsung S.A Ltd
Project Name Jubail Export Refinery Package – 3–
End User SATORP (Saudi Aramco Total Joint Venture)
Scope of Work Design, Supply
Type and Capacity of the Skid 1) Phosphate Injection System 19.6 LPH @ 45.0Bar

2) Phosphate Injection System 1.8 LPH @ 9.0BarQuantity2Completion DateOctober 2011 Jubail – Saudi Arabia 

Client Name Daelim Industrial Co. Ltd.
Project Name Jubail Export Refinery Package 2b
End User SATORP (Saudi   Aramco Total Joint Venture)
Scope of Work Design, Supply
Type and Capacity of the Skid Corrosion Inhibitor Skid – 10 LPH @ -3.5 bar (1 Nos)

Antifoam Injection System – 40 LPH @ -3.5 bar (1 Nos)

Corrosion Inhibitor Skid – 50 LPH @ -3.5 bar (2 Nos)

Antifoam Injection System – 250 LPH @ -3.5 bar (2 Nos)

NaOH Injection System –1) 50 LPH @ –7.5 bar (3 Nos)

2) 25 LPH @ – 7.5 bar

Antifoam Injection System – 10 LPH @ – 4.0 bar (3 Nos)

Phosphate Injection System – 1) 2.3 LPH @-52.0 bar (3 Nos)

2) 2.3 LPH @ – 7.0 bar

Wild Naphtha Injection Sys.– 1220 LPH @-37.52 bar (2 Nos)Quantity17Completion DateOctober 2011 Khursaniyah – Saudi Arabia 

 

Client Name Hyundai Engineering & Construction Co. Ltd
Project Name Karan Gas Field Development Project
End User Saudi Aramco
Scope of Work Design & Supply
Type and Capacity of the Skid 1) Antifoam Injection System- 15.41 LPH @ 3.4bar (3 Nos.)

2) Amine Injection System- 15.41 LPH @ 3.4bar (3 Nos.)

3) Antifoam Injection System – 242.4 LPH @ 5.9bar (3 Nos.)

(4 Heads Pump)Quantity9Completion DateJune 2011

 Qassim – Saudi Arabia 

Client Name Gulf Consolidated Contracting Co.
Project Name Crude Oil Pipeline Project
End User Saudi Electric Co. (SEC)
Scope of Work Design & Supply
Type and Capacity of the Skid Corrosion Inhibitor Skid – 0.4 LPH @ 60.0 bar
Quantity 1
Completion Date June 2011

 Riyadh, Qassim and Al Hasa – Saudi Arabia 

Client Name Gulf Consolidated Contractors Co.
Project Name DRI Upgrade Project
End User Saudi Aramco
Scope of Work Design, Supply & Commissioning
Type and Capacity of the Skid 1) Riyadh:

i) Detergent Inj. System – 270 LPH @ 8.5 bar

ii) Detergent Inj. System – 180 LPH @ 8.5 bar

2) Qassim:

i) Detergent Inj. System – 140 LPH @ 8.5 bar

3) Al Hasa:

i) Detergent Inj. System – 270 LPH @ 8.5 bar

ii) Detergent Inj. System – 50 LPH @ 8.5 barQuantity1Completion DateJune 2011

 

Uthmaniyah – Saudi Arabia 

Client Name Bonatti SPA
Project Name Optimize Production in Mubarraz Area – ARAMCO GOSP 7&8
End User Saudi Aramco
Scope of Work Design & Supply
Type and Capacity of the Skid 1) Scale Inhibitor Dosing Skid – 17 l/h @ 55.17 bar         (01)

2) Corrosion Inhibitor Dosing Skid – 17 l/h @ 55.17 bar   (01)

3) Scale Inhibitor Dosing Skid – 9.46 l/h @ 55.17 bar       (01)

4) Corrosion Inhibitor Dosing Skid – 9.46 l/h @ 55.17 bar  (01)Quantity4Completion DateNovember 2010

 

Qatif – Saudi Arabia 

Client Name Saudi Aramco
Project Name Qatif Oil Field
End User Saudi Aramco
Scope of Work Design, Supply, Installation & Commissioning
Type and Capacity of the Skid Corrosion Inhibitor Skid – 1.6 LPH @ 140 bar
Quantity 2
Completion Date October 2010

 

Khursaniyah – Saudi Arabia 

Client Name GS Engineering & Construction Corporation
Project Name Manifa Gas Facilities
End User Saudi Aramco
Scope of Work Design & Supply
Type and Capacity of the Skid 1) Eliminox Injection System – 30 LPH @ 55 bar

2) Phosphate Injection System – 34 LPH @ 55 barQuantity4Completion DateJuly 2010

 

Safaniyah – Saudi Arabia 

Client Name M.S. Suwaidi Industrial Services Co. Ltd.
Project Name Northern Area Waste Water Upgrade
End User Saudi Aramco
Scope of Work Design & Supply
Type and Capacity of the Skid 1) Neutralization Injection System: 454 LPH @ 2.5 bar
Quantity 4
Completion Date July 2010

 

Safaniyah – Saudi Arabia 

Client Name M.S. Suwaidi Industrial Services Co. Ltd.
Project Name Northern Area Waste Water Upgrade
End User Saudi Aramco
Scope of Work Design & Supply
Type and Capacity of the Skid 1) Alum Dosing Injection System : 70 LPH @ 7 bar
Quantity 2
Completion Date February 2010

 

Berri – Saudi Arabia 

Client Name Saudi Aramco
Project Name Berri Gas Plant
End User Saudi Aramco
Scope of Work Design & Supply
Type and Capacity of the Skid 1) Caustic Soda Injection System : 3.78 LPH @ 7.6 bar
Quantity 1
Completion Date January 2010

 

Ras tannura – Saudi Arabia 

Client Name Samsung Engineering
Project Name Ras Tannura Refinery Diesel Hydrotreator complex
End User Saudi Aramco
Scope of Work Design & Supply
Type and Capacity of the Skid 1) Corrosion Inhibitor Injection Unit – 2.08LPH @13 bar

2) Anti-Form Injection Unit – 4.6 LPH @ 10.7 Bar

0.48 LPH @ 26 Bar

3) Phosphate Injection Unit – 0.48 LPH @ 47 Bar

0.48 LPH @ 9 BarQuantity3Completion DateOctober 2009

 

Rabigh – Saudi Arabia 

Client Name Salem Saleh Al Hareth Est.
Project Name Rabigh Conversion Industrial Park Development Project
End User Saudi Aramco
Scope of Work Design, Supply, Installation & Commissioning
Type and Capacity of the Skid 1) Caustic Soda Injection System : 5.5 LPH @ 6 bar
Quantity 1
Completion Date May 2009

 

Abqaiq – Saudi Arabia 

Client Name Saudi Aramco
Project Name Abqaiq GOSP 6 – New Well Site Abqaiq-173
End User Saudi Aramco
Scope of Work Design & Supply
Type and Capacity of the Skid 1) Corrosion Inhibitor Skid  – 0.95 LPH@ 143 Bar

2) pumps – double headQuantity1Completion DateMay 2009

 

Shedgum – Saudi Arabia 

Client Name Al Robaya Est for Contracting
Project Name Shedgum GOSP-2
End User Saudi Aramco
Scope of Work Design, Supply, Installation & Commissioning
Type and Capacity of the Skid 1) Sodium Hypochlorite Injection System : 3.79 LPH@ 7.6 bar
Quantity 1
Completion Date March 2009

 

Khursaniyah – Saudi Arabia 

Client Name Snamprogetti
Project Name Khursaniyah Gas Plant- Phase- II
End User Saudi Aramco
Scope of Work Design & Supply
Type and Capacity of the Skid 1) Coagulant Injection Skid  – 26.4 LPH @ 10 Bar

2) Sodium Bisulphate Injection Skid  – 26.4 LPH @ 10 Bar

3) Anstiscalant Injection Skid  – 12 LPH @ 10 BarQuantity3Completion DateAugust 2008

 

Riyadh – Saudi Arabia 

Client Name Saudi Oger Ltd.
Project Name King Abdullah Bin Abdulaziz – Janadriyah Farm – Phase-3
End User King Abdullah Bin Abdulaziz – Janadriyah Farm
Scope of Work Design, Supply, Installation & Commissioning
Type and Capacity of the Skid 1.      Sodium Aluminate Dosing Pump – 32 lph @ 3 bar   (02)

 

2.     Flocculant Dosing Pump – 7 lph @ 5.5 bar  (02)

3.     Cleaning Product Dosing Pump – 4.8 lph @ 5.5 bar   (01)

4.     Acid dosing Pump – 47 l/h @ 4 bar   (02)

5.     Caustic soda Dosing Pump – 47 l/h @ 4 bar   (02)

6.     Chlorination Dosing Pump – 20 l/h @ 2 bar   (03)

7.     Flocculation Dosing Pump – 4.80 l/h @ 6 bar   (04)

8.     Antiscalant Dosing Pump – 4.80 l/h @ 6 bar     (02)

9.     Chlorination Dosing Pump – 4.80 l/h @ 6 bar   (02)

10.  Antiscalant Dosing Pump – 4.80 l/h @ 6 bar     (02)

11.  Antiscalant Dosing Pump – 4.80 l/h @ 6 bar     (03)

12.  De-chlorination Dosing Pump – 7.2 l/h @ 6 bar   (03)

13.  Neutralization Dosing Pump – 4.80 l/h @ 6 bar   (02)

14.  Neutralization Dosing Pump – 4.80 l/h @ 6 bar   (02)

15.  Cleaning Solution Dosing Pump – 7.20 l/h @ 6 bar  (02)

16. Coagulant Dosing Pump – 7.20 l/h @ 6 bar  (04)Quantity32Completion DateMarch 2008

 

Basra – Saudi Arabia

Client Name Department for International Development (DFID)
Project Name Al Zubayr Petrochemical Plant
End User Al Zubayr Petrochemical
Scope of Work Design, Supply, Installation & Commissioning
Type and Capacity of the Skid 1) Acid Injection Skid  – 65 ltr/hr @ 7 bar

2) Antiscalant Injection Skid  – 11 ltr/hr @ 7 bar

3) Acid Injection Skid  – 35 lit/hr @ 12 bar

4) NaOH Sclant Injection Skid  -4.4 lit/hr @ 10 bar

5) Sodium Hypochlorite Injection Skid  – 2.1 lit/hr @ 16 barQuantity5Completion DateJanuary 2008

 

Ras Tanura – Saudi Arabia

Client Name Saudi Aramco (LPG)
Project Name Saudi Aramco
End User Saudi Aramco
Scope of Work Design & Supply
Type and Capacity of the Skid 1) Chlorination Injection Skid : 5.7 lph @10 bar
Quantity 1
Completion Date December 2007

 

Uthmaniyah – Saudi Arabia

Client Name Al Osais Trading & Contracting
Project Name Control System Upgrade at Uthmaniyah GOSP 7,8 & 10
End User Saudi Aramco
Scope of Work Design, Supply, Installation & Commissioning
Type and Capacity of the Skid 1) Sodium Hypo. Injection Skid  24GPD @ 7.6 Bar (5)
Quantity 5
Completion Date October 2007

 

Shedgum – Saudi Arabia

Client Name Saudi Aramco
Project Name Shedgum Gas Plant – 1ST  Pass
End User Saudi Aramco
Scope of Work Design, Supply & Commissioning
Type and Capacity of the Skid 1) Sulphuric Acid Injection Skid  – 0.275 USGPM

2) Antiscalant Injection Skid  – 0.275 USGPMQuantity2Completion DateOctober 2007

 

Khurais – Saudi Arabia

Client Name A. A. Turki Corporation
Project Name Aramco Industrial  Complex
End User Saudi Aramco
Scope of Work Design, Supply, Installation & Commissioning
Type and Capacity of the Skid 1) Prechlorination Acid Injection Skid – 4.42 LPH@10 Bar

2) Polymer Injection Skid – 4.42 LPH@10 Bar

3) Coagulant Injection Skid – 4.42 LPH@10 Bar

4) Chlorine Injection Skid – 4.42 LPH@10 Bar

5) Post chlorination Injection Skid –  4.42 LPH@10 BarQuantity5Completion DateSeptember 2007

 

Al Hasa – Saudi Arabia

Client Name Abdullah Ahmed Dossary Co.
Project Name Water Supply Improvement at Saudi Aramco
End User Saudi Aramco
Scope of Work Design, Supply, Installation & Commissioning
Type and Capacity of the Skid 1) Sodium hypochlorite Injection Skid – 92 gpd @ 150 psig
Quantity 2
Completion Date July 2007

 

Abqaiq – Saudi Arabia

Client Name F.M. Al Qahtani Sons
Project Name Aramco Abqaia Plant Phase-II
End User Saudi Aramco
Scope of Work Design, Supply, Installation & Commissioning
Type and Capacity of the Skid 1) Sodium Metabisulfite Injection Skid  – 0.095GPM

2) Scale Inhibitor Injection Skid – 0.0633 GPM

3) Sodium Hexameta Phosphate Skid – 0.0383 GPM

4) Soda Ash Injection Skid – 0.095 GPM

5) Sodium Fluoride Injection Skid – 0.095 GPM

6) H2SO4 (98%) Acid Injection Skid – 0.22 USGPMQuantity6Completion DateJune 2007

 

Berri – Saudi Arabia

Client Name Saudi Aramco
Project Name Upgrade of Berri Gas Plant
End User Saudi Aramco
Scope of Work Design, Supply & Commissioning
Type and Capacity of the Skid 1) 98% Sulfuric Acid Injection Skid  – 1.88 GPH/*101.5 PSI

2) Anstiscalant Injection Skid  – 1.16GPH/*145 PSI

3) Hypochlorite Injection Skid  – 1.16GPH/*145 PSIQuantity3Completion DateNovember 2006

 

Melut Oil Basin – Sudan

Client Name Petrodar  Operating Co. Ltd(Produced Water Package)
Project Name Melut Basin Oil Development Project
End User Petrodar  Operating Co. Ltd
Scope of Work Design & Supply
Type and Capacity of the Skid 1) Biocide  Injection Skid ExBb – 60 L/Hr @ 2 Bar – 2

2) Oxygen Scavenger Injection Skid ExBb – 26 L/Hr @ 4 Bar – 2Quantity4Completion DateSeptember 2006

 

Melut Oil Basin – Sudan

Client Name Petrodar  Operating Co. Ltd(Raw Water Package)
Project Name Melut Basin Oil Development Project
End User Petrodar  Operating Co. Ltd
Scope of Work Design & Supply
Type and Capacity of the Skid 1) Sodium Hypochlorite Injection Skid – 4.1 l/h @ 16 bar  (04)
Quantity 4
Completion Date December 2005

 

Qatif (North) – Saudi Arabia

Client Name Snamprogetti
Project Name Aramco Qatif – Gosp 2 North Plant
End User Saudi Aramco
Scope of Work Design, Supply & Commissioning
Type and Capacity of the Skid 1) Calcium Hypochlorite Injection Skid – 4.3 l/h @ 10 bar

2) Ferric Chloride Injection Skid – 4.3 l/h @ 10 bar

3) Polymer Injection Skid – 4.3 l/h @ 10 barQuantity3Completion Date2004

 

Qatif (North) – Saudi Arabia

Client Name Arabian CBI Ltd.
Project Name Aramco Qatif – Gosp 2 South Plant
End User Saudi Aramco
Scope of Work Design & Supply
Type and Capacity of the Skid 1) Hypochlorite Injection Skids – 2.5 gph @ 150 psi.
Quantity 3
Completion Date 2004

 

Riyadh – Saudi Arabia

Client Name Saudi Wiemer Trachte Ltd.
Project Name Riyadh Flour Mills
End User
Scope of Work Design, Supply, Installation & Commissioning
Type and Capacity of the Skid 1) Sodium Hypochlorite Injection Skid – 42 l/hr @ 10 bar
Quantity 1
Completion Date 2004

 

Jubail – Saudi Arabia

Client Name Royal Commission – ALMACON
Project Name Upgrade of Central RO System  in Jubail
End User Royal Commission
Scope of Work Design, Supply, Installation & Commissioning
Type and Capacity of the Skid 1) Antiscalant Injection Skid – 57 lit/Hr @ 12 Bar

2) Soda Ash Injection Skid – 264 Lit/H @ 7 BarQuantity16Completion Date2002

Exit mobile version